[Skip to Content]
Proposed MTIP Amendment - Slip Preliminary Engineering phase of Eugene-Springfield sensors/cameras phase 2 project (ODOT)
Proposed MTIP Amendment - Slip Preliminary Engineering phase of Eugene-Springfield sensors/cameras phase 2 project (ODOT)
Proposed MTIP Amendment -Slip Preliminary Engineering phase of Eugene-Springfield sensors/cameras phase 2 project (ODOT)
Views3
Interactions0
Closed
Share
Share

Project is to Install cameras and traffic sensors at various locations in Eugene. Video and data is used for traffic operations and traffic planning. Locations are: OR569 at OR99W, Barger Ave, and W. 11th; and at I-105 at Coburg Road.

This ODOT project is funded with Region 2 Fix-it funds. The existing project phases are Preliminary Engineering (FFY18) and Construction (FFY20). The amendment would slip Preliminary Engineering phase to FFY19.


Idea Collaboration by  MindMixer